Thursday, February 27, 2020

Private Unions Assignment Example | Topics and Well Written Essays - 250 words

Private Unions - Assignment Example Different labor markets address this issue differently depending on the extent to which such unions are needed. On the same note, both employees and employers remain divided over these unions, especially in an economy where the government addresses worker concerns with or without worker unions. Due to the fact that the government monitors the welfare of both employees and employers in the various labor markets in the economy, legislations that seek to strengthen unions in terms of their position in the economy and number or registered members are not necessary. Whether or not an employee should join a union should be a personal decision. â€Å"Right to Work† States have granted employees the right to decide whether or not to join unions or even support them financially, although there are exceptions to the railway and airline industries (Freeman, 2008). This move is beneficial to employees since they cannot be forced into unions or make mandatory contributions to unions that they do not wish to be in. Employees can push for their own welfare, air their concerns, and also balance employer-employee power without necessary depending on a

Tuesday, February 11, 2020

Site Planning and Construction Method Essay Example | Topics and Well Written Essays - 1000 words

Site Planning and Construction Method - Essay Example For the construction of the art gallery these points were kept in mind while reaching the final design. Considering these points and a few other, the most suitable design suggested is a RCC frame structure. The columns and beams both the storey will be at same positions but the position of the partition walls for both the storey will have different positions. The partition walls for all the rooms except the entrance hall and the lobby will be of brickwork while that of the entrance hall and lobby will be of hollow PCC blocks. The location of the site dictates the orientation of the building. The building will face the Lower Ham Road while the lobby will be open at the south, the opening will face the south bank of Thames. The reduced level i.e. the plinth level of the building will be kept well above the boat house to facilitate the river view for the lobby. The construction plan firstly involves the planning of the program. The gradual execution of projects and activities and the allocation of time and resources to different activities will be done by using planning aiding software i.e. MS Project. In order to avoid conflicts and problems proper constraints and deadlines will be applied to the activities regarding time and resources (procurement as well as human resource. Excavation and Foundation: The excavation will be carried out using excavator while the geology of the site i.e. near the river requires deep foundations which will be done by drilling precast RCC piles Super Structure: As stated in the brief the super structure will be a frame structure with brickwork partition walls for all the rooms except the entrance hall and lobby which will utilize hollow PCC blocks in partition walls As shown in the plan of the ground floor, there’s a large window on the side of the lobby facing the river to facilitate the riverside view. The geometric staircase ensures lesser use of space but looks aesthetically good. The schedule of openings